PROJECT: Atlantis Phase II Conspan Bridge
Paradise Island, Bahamas
COMPLETED: January 1999
CLIENT: Sun International
SPECIFICS: This project was completed for Sun International as part of their Atlantis Hotel and Casino development in the Bahamas.  An open cut 1,600-foot long tunnel below sea level was constructed to provide vehicular access to the marina portion of the development.    The tunnel work consisted of the excavation of 120,000 CY of rock, the installation of an extensive dewatering system, and the installation of 12,500 tons of rebar, 355 soil anchors, 18,500 CY of concrete and the utility systems. 