Projects
PROJECT: St. Ignace/Mackinac Island Submarine Cable Crossing
COMPLETED: June 1988
CLIENT: Edison Sault Electric Co.
Sault Ste. Marie, Michigan
SPECIFICS: Simultaneously installed four each 25KV armored submarine cables. Each cable was 18,200 feet in length. Drilling and blasting was required for trench embedment.

BACK